top of page
Search
Writer's pictureAdmin

Another project moving from design to build.

Great to see another project move from design to build. Pictured below are the first photos in from the field today of the installation of the silo tanks which will make up the process tankage for our latest Membrane BioReactor (MBR) project in Washington State. The first phase of this plant will treat 25,000 gallons per day (GPD) and the flexible design will allow for additional systems to be added to facilitate the growth of the development. Our Silo BioReactors are optimized to maximize oxygen transfer and provide economies not just in OPEX but CAPEX as well and come in standard solutions ranging from 10,000-100,000 GPD. Once online the system will provide a continuous supply of reuse water for the community and nearby agriculture. Reach out to learn more about our turn-key solutions (www.enereau.com). #wastewatertreatmentplants #turnkeysolutions #sustainablebuildings #circulareconomy #waterreuse #greenbuildings #membranebioreactor #mbr #membranefiltration #enereau




14 views0 comments

Comments


bottom of page